News & Reviews Product Reviews Wuhu 0 4 0T locomotive update

Wuhu 0 4 0T locomotive update

By Marc Horovitz | April 19, 2013

| Last updated on November 3, 2020


A look at a modified version of the engine

Email Newsletter

Get the newest photos, videos, stories, and more from Trains.com brands. Sign-up for email today!

wuhu_update
Marc Horovitz
In the April 2013 GR, we reviewed Wuhu Brand’s live-steam Falk gypsy logging locomotive. We have received a new product sample that incorporates several revisions, so we thought it only fair to mention them here. According to the factory, these revisions include reducing the diameter of the jet orifice from 0.25mm to 0.2mm to increase the running time of the engine; moving the oil tank, which is located under the winding shaft at the front of the engine, forward by 1mm and increasing the oil-filler plug diameter to 6mm, both to aid in oil filling; moving the safety valve, formerly inside the cab close to the filler plug, to the steam dome, making it easier to access the water-filler plug; providing a fixed top to the water tank in the cab, with a separate, smaller hatch lid for adding water, to mitigate water sloshing out into the cab.

I’ll address these points one by one. The running time of this second engine may or may not have been affected by the jet size—see below. Moving the lubricator forward by a single millimeter is negligible—it’s still awkward to get at. However, making the oil filler hole bigger is a definite improvement, making refilling the lubricator easier.

Moving the safety valve to the top of the steam dome, behind the whistle, is also good. It removes it from the cab, where its position hampered access to the filler plug, and puts it in a more prototypical place. The fixed water-tank top in the cab is also an improvement but now necessitates the use of a large syringe adding water.

In comparing the new model with the old, I noticed several small differences in details, such as handrails and paint. The axle pump is a little higher, too, which is good, as it will not foul the switches.
Another big improvement I noticed was the pressure gauge. The first model had one that simply did not work. The improved version has a beautiful little gauge that functions perfectly.

For the test run I prepared the engine in the usual way, then fired it up on my indoor track. Pressure was up to 45 psi in around nine minutes. I opened the throttle, gave the engine a push to clear the cylinders, and it took off. This sample, like its predecessor, is fast and difficult to control. It can be throttled down to a reasonable speed, even if running light, but the track must be very level.

After 15 minutes of steady running, the boiler was out of water. There was still gas in the tank. In checking the water reservoir in the cab, I saw that the level had not dropped much, so the axle pump evidently was not working properly. If it had been, a longer run time could be expected.

The improvements that Wuhu has made to this model do help its performance and maintenance. Kudos to them for listening to their customers and taking action.

You must login to submit a comment