LAS VEGAS, Nev. — The tourism organization that owns the Las Vegas Monorail is considering spending up to $12 million to keep the 3.9-mile, seven-station transit system running for at least another decade. The monorail, which dates to 2004, was purchased by the Las Vegas Convention and Visitors Authority in 2020. Now the authority is […]
Read More…
MONTREAL — With the province of Quebec walloped by at least 15 inches of snow in the last few days followed by plunging temperatures, VIA Rail Canada management delayed Sunday’s eastbound and westbound Montreal-Halifax Ocean by 13 hours rather than cancel one of the trains. Additional blowing snow — about 27 inches is now on […]
Read More…
PIERRE, S.D. — A resolution in the South Dakota House is calling for support of the state’s congressional delegation and the Trump Administration for Amtrak service in the state. House Resolution 6008 is sponsored by Rep. Tim Goodwin, a Republican who represents the 30th District, in the state’s southwestern corner. It was introduced on Feb. […]
Read More…
LOS ANGELES — To help provide additional equipment for Amtrak Pacific Surfliner trains, the service’s operating agency has turned to using seven rebuilt, ex-New Jersey Transit Comet 1B coaches for the past seven months. The Comet 1B coaches, which arrived in Los Angeles in June of 2024, were originally part of a larger, 14-car purchase […]
Read More…
SEATTLE — Reduction of Sounder commuter rail service will continue until further notice, Sound Transit has announced. Two of the four round trips on the N Line between Seattle and Everett have been suspended, as have two of the 13 round trips on the S line between Seattle and Tacoma/Lakewood. The revised schedules are available […]
Read More…
CHICAGO — Amtrak has cancelled Empire Builder departures for a third straight day, the company announced early today (Monday, Feb. 17). Also cancelled: both directions of the Borealis, westbound between Chicago and St. Paul and eastbound between St. Paul and Milwaukee, as well as both directions of the Adirondack between Montreal and Albany Rensselaer, N.Y. […]
Read More…
With all the same enthusiasm and expertise demonstrated in previous Model Railroader Project Layout efforts, host David Popp and Bryson Sleppy begin constructing the East Troy Industrial Park (ETIP) model railroad! While it will be just a small semblance of the former Milwaukee, Racine, & Troy HO scale (1:87.1) layout, the all-new ETIP promises to […]
Read More…
CHICAGO — Departures of the Empire Builder have been cancelled in both directions today (Sunday, Feb. 16), for a second straight day, according to Amtrak’s website. No information on either cancellation was provided on the website or the Amtrak Alerts social media feed. However, the westbound Builder that was due in Portland at 11:17 a.m. […]
Read More…
A deadly storm that that has brought significant flooding and other damage to at least five southeastern states has hit Norfolk Southern operations. CSX has also been impacted, although details are not currently available. An NS advisory of midday today informed intermodal customers that the route between Portsmouth, Ohio, and Bluefield, W.Va., is currently impassable, […]
Read More…
OTTAWA, Ontario — VIA Rail Canada has trimmed trains from its Ottawa-Toronto schedule until at least March because of equipment availability issues, the transportation advocacy group Transport Action Canada reports. In a post on its website, the group lists these trains as currently suspended: — Daily trains No. 42 (a 12:17 p.m. departure from Toronto) […]
Read More…
CHICAGO — Amtrak has cancelled Empire Builder departures in both directions scheduled for today (Feb. 15, 2025), as well as the eastbound Borealis and one westbound Wolverine. Two Northeast Corridor trains have also been cancelled. The reasons for the cancellations differ. According to posts on the Amtrak Alerts feed on X.com, the Empire Builder slated […]
Read More…
MONTREAL — Most of the Réseau express metropolitain light rail network will be open in October, according to the head of the company overseeing construction of the Montreal-area system. But before then, the portion of the REM that is currently operating will be shut down for six weeks as part of systemwide testing. The CBC […]
Read More…