Canadian Canyons Series: Part 1 – Building the framework

David Popp with wood pieces

Having trouble viewing this video?   Please visit our Video FAQ page The fun begins as David Popp launches into the effort to assemble our N scale Canadian Canyons project layout! In this first of several videos addressing benchwork, David shows how to use a butt-joint framing technique to build a substructure that’s both rigid […]

Read More…

Off The Rails: Episode 9

Off the Rails with Gerry Leone Episode 9

Having trouble viewing this video?   Please visit our Video FAQ page It’s confirmed. Our pal and Contributing Editor Gerry Leone is full of hot air! In this episode of MRVP’s Off The Rails, he puts it to good use as he dusts off an old technique/tool for applying scenery to a model railroad. […]

Read More…

Off The Rails: Episode 8

One hand holding a straight edge on a piece of hobby wood, another hand holding a special hobby tool.

Host Gerry Leone introduces one handy dandy tool with a couple clever model railroad applications. In this episode, he’ll show and share how an inexpensive pounce wheel can make your modeling efforts more efficient and more accurate too! […]

Read More…

Off The Rails: Episode 7

Man standing behind small table surrounded by model train layout holding small plastic box.

In this episode of Off The Rails, show host Gerry Leone gives you the hole truth, and nothing but the hole truth! Follow along as he shares his handy tips, tricks, tools, and techniques for making, enlarging, and finishing holes. And don’t miss a special appearance by another one of Gerry’s feline assistants! […]

Read More…

Off The Rails: Episode 6

Fingers holding a small metal ring.

This episode of Off The Rails is nuts! But it’ll make perfect sense to a smart and savvy model railroader like you, and the show host Gerry Leone! While Gerry ventures away from the rails, he still manages to keep right on track in one particular aisle of his local hardware store. Join him as […]

Read More…

Winston-Salem Southbound Series: Preparation for Operation

Having trouble viewing this video?   Please visit our Video FAQ page Now that work on the trackwork, scenery, structures, details, motive power and rolling stock is nearly complete on our Winston-Salem Southbound HO scale project layout, it’s time to try running it like a real railroad. But before a single axle turns, MRVP’s David […]

Read More…