Olympia Logging Series: Part 12 – Backdrop painting

Hand holding airbrush painting a back drop.

Using little more than a cardstock template and a couple paint colors, artist Jay Smith shows viewers just how quick and easy it is to add a realistic pine forest treeline to MRVP’s On30 Olympia Logging Co. layout. Jay used his favorite internal mix airbrush to apply the paint, but his simply technique for making […]

Read More…

Modeler’s Spotlight Video–Inside Cody’s Office for June 2014

Inside Cody's Office for June 2014

Having trouble viewing this video?   Please visit our Video FAQ page In this month’s episode of Cody’s Office, you’ll get a handy tip for weathering model railroad ballast using an airbrush. Associate editor Cody Grivno demonstrates his favorite techniques on the Model Railroader staff’s N scale Red Oak project layout, which won’t appear in print until […]

Read More…

Olympia Logging Series: Part 10 – painting trackwork

Having trouble viewing this video?   Please visit our Video FAQ page Adding weathering effects to the trackwork of MRVP’s On30 Olympia Logging Co. layout can be just as beneficial as adding them to locomotives, rolling stock and structures. In this video, Cody Grivno walks through the steps for giving the rails and ties a […]

Read More…

Olympia Logging Series: Part 9 – laying track

Having trouble viewing this video?   Please visit our Video FAQ page All the prep work is done, so now David can get down to the task of installing flexible On30 track and turnouts on MRVP’s Olympia Logging Co. layout. David demonstrates all of the essential tracklaying steps, including how to cut and trim the […]

Read More…

Olympia Logging Series: Part 8 – installing cork roadbed

David Popp laying cork roadbed.

Installing cork roadbed is the first step to laying reliable trackwork on MRVP’s On30 Olympia Logging Co. display-style layout. In this video, David shows you basic techniques for preparing, cutting, fitting, and securing the HO scale roadbed along the main line, sidings, and on the sector plate. Plus, David also demonstrates how one specific product […]

Read More…

Olympia Logging Series: Part 7 – modifying a turnout

David Popp sitting at workbench in the Model Railroader workshop

Before the trackwork can be added to MRVP’s On30 Olympia Logging Co. display-style layout, David Popp first makes a few modifications to the turnouts. In this video, he guides you through trimming the ties, preparing the connection points, soldering new wires, cutting the rails, and testing the modifications – steps that are intended to make […]

Read More…

Modelers Spotlight Video: Inside Cody’s Office for May 2014

Cody sitting at his desk with trains in front of him

Having trouble viewing this video?   Please visit our Video FAQ page Big diesels abound in this episode of Cody’s Office. This month Cody takes a look at prototype-specific HO scale SDP45 diesel locomotives from Athearn Trains. He’ll also show you HO scale ES44AC and SD70ACe diesels decked out in Norfolk Southern heritage paint schemes […]

Read More…

DCC Programming: episode 7 – Programming modes

Operations mode, programming on the main.

Having trouble viewing this video?   Please visit our Video FAQ page   Model Railroader magazine’s Dana Kawala addresses basic DCC programming modes. Dana first talks through Operations mode programming on the main, as well as Service mode programming. As with every episode in this helpful DCC Programming series, Dana shows you the essential steps, while […]

Read More…