Let’s say it all together now…it’s time for another episode of Rehab My Railroad: Jones Island! David and Cody have teamed up to take on more trackwork and test the space allotted for signature structures in the terminal. Plus, Dana works out the wiring for the Rapido RailCrew On-Off Uncoupler. […]
Modeling Topic: DCC & Wiring
Modeling
[…]
Summer Camp: Day 3 Morning
A care package has arrived at camp, so David has plenty to keep him busy in this session! With parts now in-hand, our Camp Director leads us through the steps for installing a capacitor pack in his HO scale Rapido RS-11 diesel locomotive. […]
MRVP Summer Camp: Day 3 Morning
A care package has arrived at camp, so David has plenty to keep him busy in this session! With parts now in-hand, our Camp Director leads us through the steps for installing a capacitor pack in his HO scale Rapido RS-11 diesel locomotive. […]
MRVP Summer Camp: Day 3 Morning
A care package has arrived at camp, so David has plenty to keep him busy in this session! With parts now in-hand, our Camp Director leads us through the steps for installing a capacitor pack in his HO scale Rapido RS-11 diesel locomotive. […]
Summer Camp: Day 3 Morning
A care package has arrived at camp, so David has plenty to keep him busy in this session! With parts now in-hand, our Camp Director leads us through the steps for installing a capacitor pack in his HO scale Rapido RS-11 diesel locomotive. […]
Rehab My Railroad: Adding a remote uncoupler, Episode 6
David launches into this episode with a speedy survey of the progress being made on the MR&T HO scale layout reno project. But his attention quickly shifts to finishing the cork roadbed and adding a Rapido RailCrew remote uncoupling unit along an industry track lead. While he’s at it, David also shows how to install […]
Rehab My Railroad: Adding a remote uncoupler, Episode 6
David launches into this episode with a speedy survey of the progress being made on the MR&T HO scale layout reno project. But his attention quickly shifts to finishing the cork roadbed and adding a Rapido RailCrew remote uncoupling unit along an industry track lead. While he’s at it, David also shows how to install […]
How-to Library: Signaling with JMRI, Part 2
The JMRI signaling series continues with MRVP’s Ben Lake taking a closer look at the Layout Editor tool within PanelPro software. On the Canadian Canyons N scale layout, Ben shares his process and insights for using Layout Editor to link various components (turnouts, track segments, etc.) of a signaling system. […]
MRVP Insider: MRVP Underground with David Popp, Episode 22 – Hanging on the ropes
For this July episode of MRVP Underground, host David Popp is on the task of stringing new LED rope lighting over his Olympia Logging Co. On30 layout. Plus, you’ll also see how simple it is to add a stelllar sound system to complement the layout’s light show! […]
MRVP Insider: MRVP Underground with David Popp, Episode 20 — More electrifying insights
Host David Popp still has plenty more to address regarding the wiring of his Olympia Logging Co. On 30 layout! So it’s a good thing that MRVP’s Gerry Leone is back (via virtual meeting) to provide a few tips while David powers up his final push to make all of the right connections. […]
How-to Library: Signaling with JMRI, Part 1
Ben Lake is back to tackle the signaling system for MRVP’s Canadian Canyon N scale layout. The “Signal Mast Logic” in JMRI PanelPro is at the heart of this setup. After a quick refresher of the essential components found on the layout, Ben launches right into installation and configuration demos. This is Part 1 of […]