News & Reviews News Wire Extensive delays, Empire Builder cancellation add to Amtrak disruptions

Extensive delays, Empire Builder cancellation add to Amtrak disruptions

By Trains Staff | February 8, 2025

VIA Rail’s Canadian not immune to harsh conditions, adds to string of recent delays

Email Newsletter

Get the newest photos, videos, stories, and more from Trains.com brands. Sign-up for email today!

BNSF locomotive leading passenger train
A BNSF locomotive leads the three Amtrak ALC42 diesels on the late-running westbound Empire Builder on Feb. 8, 2025, in Rugby, N.D. Dale Niewoehner

CHICAGO — In the latest round of Amtrak operating issues, fallout from days of late trains has again inconvenienced passengers along the Empire Builder’s Chicago-Seattle/Portland, Ore., route, causing cancellation of one round trip.

Other significant disruptions befell Southwest Chief and Lake Shore Limited departures, and reports say VIA Rail Canada’s westbound Canadian encountered snow-covered frozen switches lacking heaters, causing a 6-hour standstill at Nokomis, Sask., east of Saskatoon.

As is generally the case, the exact cause of en-route breakdowns are not always revealed in status reports, but malfunctioning locomotives remain the leading suspects.

Friday’s eastbound Builder from Seattle and Portland was cancelled after delays to the westbound train departing Chicago on Feb. 5 suffered another lengthy pause. That five-hour stop occurred waiting for a sufficiently rested operating crew at Whitefish, Mont., after the train endured a locomotive swap west of Stanley, N.D. [see, “Amtrak mechanical challenges …,” Trains News Wire, Feb. 6.,2025]. Its two sections arrived on the West Coast about 20 hours late this morning (Saturday, Feb. 8). With no spare equipment in Chicago, Monday’s westbound train is being cancelled.

Meanwhile, the westbound Builder departing Chicago Friday afternoon experienced “engine issues with the trainset,” according to Amtrak’s train status report, after departing St. Cloud, Minn., on time. A photo taken at Rugby, N.D., today revealed that a BNSF Railway freight locomotive was coupled in front of three Siemens ALC42s. Running 7 hours, 48 minutes late as of its most recent stop (Stanley, N.D., at 6:34 p.m.) , this train will likely be short-turned at Spokane, Wash., with buses substituted to Seattle and Portland, Ore. The fact that there is no eastbound counterpart across Montana complicates the crew turn situation, so there may be other cascading disruptions.

Among the other trains registering lengthy delays:

— Thursday’s eastbound Southwest Chief out of Los Angeles sustained “engine issues adding a freight engine” between Fullerton and Riverside, Calif. Because another Amtrak locomotive apparently wasn’t available from Amtrak’s Redondo Junction engine terminal, what was originally a 5-hour delay grew to 10 hours by the time the train reached Kansas City, Mo., this afternoon.

— Friday’s westbound Lake Shore Limited was stopped seven hours between Utica and Syracuse, N.Y. It arrived into Chicago at 4:51 p.m. Saturday afternoon, 6 hours, 39 minutes behind schedule.

— The Floridian lost another 4 hours between Toledo and Elkhart, Ind., on Saturday. It arrived Chicago at 3:11 p.m., 6 hours, 26 minutes late and less than two hours before the tardy Lake Shore.

— The eastbound California Zephyr was 6 hours late leaving Truckee, Calif., after being held there while UP forces repaired a broken rail on Thursday. It made up some time, arriving in Chicago at 7:05 p.m., 4 hours, 26 minutes late.

As a result, few east-west passengers were able to make scheduled long-distance connections at Chicago today in either direction. Only the westbound Cardinal was close to on time arriving. This evening’s eastbound Floridian is, at this writing, scheduled for a one-hour departure delay “due to the late arrival of inbound equipment,” while the eastbound Lake Shore is currently slated to depart at midnight, 2 hours, 30 minutes late, although Amtrak’s website says “a delay of up to approximately 3 hours is anticipated.”

Passenger train with dome cars on straight next to highway
The westbound Canadian is 17 hours late at Batchelor, British Columbia, north of Kamloops, on Jan. 26, 2025. Several departures In January encountered delays totaling 20 hours. Russ Grycan

In Canada, VIA Rail Canada’s westbound Canadian leaving Toronto on Wednesday, Feb. 5, cooled its heels for 6 hours in rural Saskatchewan Friday, according to information received by News Wire, because switch heaters were not operating across Canadian National’s 247-mile Watrous Subdivision between Biggar and Melville, Sask. The twice-weekly flagship, whose schedule is generously padded with hours of recovery time, remained 6 hours late at Jasper, Alta., on Saturday.

The Canadian has had both early and late Toronto and Vancouver, B.C. arrivals lately, but had a rough January when a number of mid-month westbounds operated up to 18 hours late as a result of freight congestion and mechanical failures.

You must login to submit a comment