News & Reviews News Wire Misaligned switch led to LIRR derailment, MTA says

Misaligned switch led to LIRR derailment, MTA says

By David Lassen | August 11, 2023

| Last updated on August 22, 2023


Wiring problem made dispatchers believe switch at Hall Interlocking was lined for straight-ahead move, investigation finds

Email Newsletter

Get the newest photos, videos, stories, and more from Trains.com brands. Sign-up for email today!

Derailed electric multiple unit trainset
A misaligned switch led to the Aug. 3 derailment of this Long Island Rail Road train, the Metropolitan Transportation Authority has said. MTA/Marc A. Hermann

NEW YORK — A misaligned switch — incorrectly shown to dispatchers as being correctly aligned for a straight-ahead move — was the cause of last week’s derailment of a Long Island Rail Road train at Hall Interlocking in Queens, the Metropolitan Transportation Authority said today (Aug. 11).

Thirteen people were injured, two seriously, in the Aug. 3 derailment of eight-car train No. 722, a 10:43 a.m. departure from Grand Central Madison bound for Hempstead, N.Y. The train was traveling at 54 mph when it derailed just east of the Jamaica station at 11:12 a.m. [see “LIRR train derails …,” Trains News Wire, Aug. 3, 2023]. Fifty-five passengers were on board.

An MTA update on its investigation said that the LIRR had conducted a required monthly inspection of the switch prior to the derailment, believes the switch did not properly realign following that inspection, and that this was not detected “because of a previously unknown vulnerability in the switch’s wiring configuration, which resulted in the train dispatcher’s display showing that the route was properly aligned when it was, in fact, not.”

Catherine Rinaldi, interim president of the LIRR and president of the Metro-North Railroad, said the incident “has exposed a unique and previously unknown localized vulnerability that has been rectified. This incident has prompted us to enhance our switch inspection processes to improve the safety of the railroad going forward.”

The switch has been rebuilt and reconfigured to address the wiring issue, according to the MTA. The LIRR has subsequently assessed all 1,045 of its switches to determine the issue was unique to that specific location, as well as developing and implementing enhanced procedures for routine inspections.

The MTA, LIRR, and Federal Railroad Administration continue to investigate the incident.

“We’re continuing to work with federal partners on a comprehensive investigation to understand exactly what led to the issue with this particular switch, and we will take the necessary steps to ensure that it never happens again,” said Pat Warren, MTA chief safety and security officer.

4 thoughts on “Misaligned switch led to LIRR derailment, MTA says

  1. Now, once again, one can understand that this could have been a much more serious incident.

    Dr. Güntürk Üstün

  2. The tests are supposed to confirm there are NO ambiguities in the operation. All designs call for “Fail Safe” operation. Obviously snnomething was missed.
    Question, What is the worst signal ? n engineer can receive. Many will say a STOP signal. That is wrong! It is a FALSE CLEAR signal. All signal system designs call for track circuits to be energized, all circuits to be complete wtc for a clear signal. Thus a broken wire or bad contact will not lead to a false permisive type of signal indication. I hope we find more about what the wiring error was.

    1. When CSX rebuilt the B&O Chicago line, an error made during signal testing resulted in a train being routed through a crossover at Republic, Ohio when the signal displayed CLEAR.
      At the time of this incident, there was no testing procedure to discover this error. Now there is!

You must login to submit a comment